Yahoo奇摩 網頁搜尋

搜尋結果

  1. Water Treatment Plant (WTP) Main Water Supply District 2017 2018 2019 2020 2021 5-year average Yuandong Water Treatment Plant Zhudong Township 897 1,130 927 1,051 ...

  2. Available on IE11, Firefox 43, Chrome 47 and Safari 9. Service Hours:AM 8:00 to PM 17:30(MON~FRI) No. 2, Jia’an Rd., Longtan Dist., Taoyuan City 325, Taiwan (R.O.C ...

  3. 2024年2月17日 · Introduction The construction of Shihmen Reservoir started in July 1954 and it was completed in June 1964. Spending almost NT$ 3,200 million, it took 8 years to construct the reservoir and more than 7000 people participating in the project. Available on IE11 ...

  4. Introduction Second Baoshan Reservoir is located in Shanhu Village,Baoshan Township,Hsinchu County.It features an off-stream reseroir densign,and obtains excess water diverted from the Shang-ping River,which is a tributary of the Touqian River.The reservoir has a total water storage capacity of 32.18 million tons.

  5. Introduction Crossing the Dahan River which is the Tamsui River in Fuxing District, Ronghua Dam was designed in October 1977 and completed in December 1983.The main facilities of Ronghua Dam is dam, secondary dam, stilling basin, spillway, and power generation plant.

  6. www.amlo.moj.gov.tw Logo 修正背景 國際接軌 近年因國際洗錢與資恐事件頻傳,我國自2007年以來洗錢 防制法落後國際標準甚遠,且2018年將進行第三輪評鑑 國內司法實務 面臨防制洗錢不彰問題,如人頭型犯罪型態、人肉運鈔、吸金

  1. 其他人也搜尋了